{"id":25873,"date":"2024-11-22T12:00:14","date_gmt":"2024-11-22T11:00:14","guid":{"rendered":"https:\/\/www.phoenixcom.cz\/press\/?p=25873"},"modified":"2026-07-17T09:33:31","modified_gmt":"2026-07-17T07:33:31","slug":"pulmiliardova-investice-do-horkovodu-pripravi-olomouc-na-odklon-od-uhli-i-na-povodne","status":"publish","type":"post","link":"https:\/\/www.phoenixcom.cz\/press\/pulmiliardova-investice-do-horkovodu-pripravi-olomouc-na-odklon-od-uhli-i-na-povodne\/","title":{"rendered":"P\u016flmiliardov\u00e1 investice do horkovod\u016f p\u0159iprav\u00ed Olomouc na odklon od uhl\u00ed i na povodn\u011b"},"content":{"rendered":"<p>Olomouc, 21. listopadu 2024 \u2013 <strong>Olomouc se do\u010dkala nejv\u011bt\u0161\u00ed investice do sv\u00e9 tepl\u00e1rensk\u00e9 s\u00edt\u011b za posledn\u00ed dv\u011b desetilet\u00ed. Spole\u010dnost Veolia Energie zde dokon\u010dila v\u00fdstavbu v\u00edce ne\u017e osmi kilometr\u016f nov\u00fdch horkovod\u016f. D\u00e9lka potrub\u00ed d\u011bl\u00e1 z&nbsp;olomouck\u00e9 realizace aktu\u00e1ln\u011b druh\u00fd nejv\u011bt\u0161\u00ed tepl\u00e1rensk\u00fd projekt v \u010cR. V\u00edce ne\u017e 29 000 olomouck\u00fdch dom\u00e1cnost\u00ed se d\u00edky bezm\u00e1la p\u016flmiliardov\u00e9 investici do\u010dk\u00e1 cel\u00e9 \u0159ady benefit\u016f. Mimo jin\u00e9 stabiln\u011bj\u0161\u00edch dod\u00e1vek tepla i tepl\u00e9 vody, sn\u00ed\u017een\u00ed emis\u00ed sklen\u00edkov\u00fdch plyn\u016f a v neposledn\u00ed \u0159ad\u011b zv\u00fd\u0161en\u00e9 odolnosti soustavy proti povodn\u00edm. Tento projekt je pln\u011b v souladu se strategick\u00fdm pl\u00e1nem skupiny Veolia s&nbsp;n\u00e1zvem GreenUp, kter\u00fd se mj. t\u00fdk\u00e1 i dekarbonizace ve\u0161ker\u00fdch aktivit skupiny.<\/strong><\/p>\n<p>Spole\u010dnost Veolia Energie zah\u00e1jila projekt rekonstrukce \u010d\u00e1sti olomouck\u00e9ho parn\u00edho syst\u00e9mu v roce 2023 a dokon\u010dila jej v \u0159\u00edjnu leto\u0161n\u00edho roku. <em>\u201eNa\u0161\u00edm hlavn\u00edm c\u00edlem byla transformace dosavadn\u00edho parn\u00edho syst\u00e9mu na modern\u00ed horkovodn\u00ed s\u00ed\u0165,\u201c<\/em> \u0159\u00edk\u00e1 <strong>Kamil Vrbka, \u0159editel regionu Morava spole\u010dnosti Veolia Energie<\/strong>, a dod\u00e1v\u00e1: <em>\u201eB\u011bhem dvou let jsme vym\u011bnili 7,5 kilometru star\u00fdch parn\u00edch rozvod\u016f, kter\u00e9 m\u011bstu slou\u017eily m\u00edsty a\u017e 60 let, a postavili v\u00edce ne\u017e osm kilometr\u016f nov\u00fdch horkovodn\u00edch rozvod\u016f.\u201c<\/em><\/p>\n<p>V\u00fdstavba nov\u00fdch horkovod\u016f prob\u00edhala ve dvou f\u00e1z\u00edch. Prvn\u00ed etapa byla kompletn\u011b realizov\u00e1na loni a vy\u017e\u00e1dala si investici ve v\u00fd\u0161i 215 milion\u016f korun. Druh\u00e1 f\u00e1ze byla dokon\u010dena letos a st\u00e1la 244 milion\u016f. Zhruba polovinu celkov\u00e9 investice ve v\u00fd\u0161i 459 milion\u016f korun pokryj\u00ed dotace z N\u00e1rodn\u00edho pl\u00e1nu obnovy.<\/p>\n<p><strong>Horkovody kl\u00ed\u010dem k&nbsp;dekarbonizaci<\/strong><\/p>\n<p>V r\u00e1mci rekonstrukce tak\u00e9 nov\u011b vzniklo zhruba p\u016flkilometrov\u00e9 propojen\u00ed, kter\u00e9 umo\u017enilo do otopn\u00e9 soustavy zapojit krom\u011b Tepl\u00e1rny Olomouc tak\u00e9 \u0160pi\u010dkovou v\u00fdtopnu Olomouc. <em>\u201eTo je mimo\u0159\u00e1dn\u011b d\u016fle\u017eit\u00e9 kv\u016fli zastupitelnosti zdroj\u016f vyt\u00e1p\u011bn\u00ed ve m\u011bst\u011b. Chyst\u00e1me se ji\u017e \u0159adu let na velk\u00fd projekt, kter\u00fdm je odchod od uhl\u00ed v Tepl\u00e1rn\u011b Olomouc. Tato dekarbonizace si ale vy\u017e\u00e1d\u00e1 rozs\u00e1hlou rekonstrukci, b\u011bhem n\u00ed\u017e bude nutn\u00e9 tepl\u00e1rnu do\u010dasn\u011b odstavit. Role prim\u00e1rn\u00edho zdroje tepla pro celou Olomouc tak bez jak\u00fdchkoliv omezen\u00ed p\u0159evezme pr\u00e1v\u011b \u0160pi\u010dkov\u00e1 v\u00fdtopna Olomouc,\u201c<\/em> prozrazuje <strong>Kamil Vrbka<\/strong>.<\/p>\n<p>Olomouc tak n\u00e1sleduje ve \u0161l\u00e9p\u011bj\u00edch P\u0159erova a dal\u0161\u00edch m\u011bst, kde z d\u016fvodu pl\u00e1novan\u00e9 dekarbonizace tepl\u00e1rensk\u00e9ho zdroje do\u0161lo k rekonstrukci parovodn\u00ed s\u00edt\u011b. Odklon od uhl\u00ed spole\u010dnost Veolia Energie realizovala \u010di se chyst\u00e1 realizovat nap\u0159\u00ed\u010d republikou. <em>\u201eDekarbonizovan\u00fd je krom\u011b Tepl\u00e1rny P\u0159erov tak\u00e9 n\u00e1\u0161 provoz ve Fr\u00fddku-M\u00edstku a Kol\u00edn\u011b. V p\u0159\u00ed\u0161t\u00edch letech budeme odch\u00e1zet od uhl\u00ed nejen v&nbsp;Olomouci, ale tak\u00e9 v Krnov\u011b, Karvin\u00e9 a Ostrav\u011b. Na dekarbonizaci m\u00e1me celkov\u011b vy\u010dlen\u011bno v\u00edce ne\u017e 20 miliard korun,\u201c<\/em> \u0159\u00edk\u00e1 <strong>Kamil Vrbka.<\/strong><\/p>\n<p><strong>\u00daspory i p\u0159ipravenost na povodn\u011b<\/strong><\/p>\n<p>V\u00fdm\u011bna potrub\u00ed v Olomouci p\u0159inese krom\u011b zastupitelnosti zdroj\u016f vyt\u00e1p\u011bn\u00ed i celou \u0159adu dal\u0161\u00edch v\u00fdhod. <em>\u201eNov\u00fd syst\u00e9m bude efektivn\u011bj\u0161\u00ed i m\u00e9n\u011b energeticky n\u00e1ro\u010dn\u00fd, tud\u00ed\u017e se na v\u00fdrobu tepla spot\u0159ebuje m\u00e9n\u011b paliva. Tak\u00e9 dojde k \u00faspor\u00e1m v\u00edce ne\u017e 45 000 GJ prim\u00e1rn\u00ed energie za rok a k&nbsp;v\u00fdznamn\u00e9mu sn\u00ed\u017een\u00ed sklen\u00edkov\u00fdch plyn\u016f. Ty ro\u010dn\u011b klesnou t\u00e9m\u011b\u0159 o p\u011bt tis\u00edc tun,\u201c<\/em> \u0159\u00edk\u00e1 <strong>Kamil Vrbka<\/strong> a pokra\u010duje: <em>\u201eDal\u0161\u00ed nespornou v\u00fdhodou nov\u00e9ho potrub\u00ed je jeho speci\u00e1ln\u00ed konstrukce odoln\u00e1 v\u016f\u010di vzedmut\u00ed spodn\u00ed vody, a dokonce i povodn\u00edm. To je mimo\u0159\u00e1dn\u011b d\u016fle\u017eit\u00e9. V\u0161ichni m\u00e1me v \u017eiv\u00e9 pam\u011bti, jakou spou\u0161\u0165 nap\u00e1chaly povodn\u011b v z\u00e1\u0159\u00ed, kdy krom\u011b tis\u00edc\u016f dom\u00e1cnost\u00ed a podnik\u016f po\u0161kodily i na\u0161e tepl\u00e1rensk\u00e9 provozy v Krnov\u011b, Ostrav\u011b a P\u0159erov\u011b. Chceme j\u00edt p\u0159\u00edkladem v investic\u00edch do efektivn\u011bj\u0161\u00ed ochrany kritick\u00e9 infrastruktury p\u0159ed velkou vodou a otopn\u00e1 soustava sou\u010d\u00e1st\u00ed kritick\u00e9 infrastruktury st\u00e1tu bezesporu je.\u201c<\/em><\/p>\n<p><strong>V\u00fdm\u011bna bez (negativn\u00edch) dopad\u016f<\/strong><\/p>\n<p>Rekonstrukci potrub\u00ed odb\u011bratel\u00e9 v&nbsp;Olomouci negativn\u011b ani nepost\u0159ehli. Pokud jde o teplou vodu, byl zaji\u0161t\u011bn n\u00e1hradn\u00ed zdroj, p\u0159\u00edpadn\u011b pro men\u0161\u00ed odb\u011bratele Veolia Energie zajistila elektrick\u00e9 topn\u00e9 spir\u00e1ly do jejich z\u00e1sobn\u00edk\u016f vody. V\u011bt\u0161\u00ed odb\u011bratel\u00e9 dostali t\u0159eba i mobiln\u00ed kotelny na lehk\u00e9 topn\u00e9 oleje. <em>\u201eU \u017e\u00e1dn\u00e9ho z na\u0161ich odb\u011bratel\u016f tak nedo\u0161lo k dlouh\u00e9 odst\u00e1vce kv\u016fli dod\u00e1vk\u00e1m tepl\u00e9 vody,\u201c<\/em> dod\u00e1v\u00e1 <strong>Kamil Vrbka<\/strong> s t\u00edm, \u017ee v\u017edy \u0161lo o odst\u00e1vku v \u0159\u00e1du n\u011bkolika hodin.<\/p>\n<a href=\"https:\/\/www.phoenixcom.cz\/press\/wp-content\/uploads\/TZ-Veolia-Nove-horkovody-v-Olomouci-FINAL-1.docx\" class=\"sc_button sc_button_style_regular theme_button sc_button_size_medium\">St\u00e1hnout tiskovou zpr\u00e1vu<\/a><em>&nbsp;<\/em><\/p>\nngg_shortcode_0_placeholder\n","protected":false},"excerpt":{"rendered":"<p>Olomouc, 21. listopadu 2024 \u2013 Olomouc se do\u010dkala nejv\u011bt\u0161\u00ed investice do sv\u00e9 tepl\u00e1rensk\u00e9 s\u00edt\u011b za posledn\u00ed dv\u011b desetilet\u00ed. Spole\u010dnost Veolia Energie zde dokon\u010dila v\u00fdstavbu v\u00edce ne\u017e osmi kilometr\u016f nov\u00fdch horkovod\u016f. D\u00e9lka potrub\u00ed d\u011bl\u00e1 z&nbsp;olomouck\u00e9 realizace aktu\u00e1ln\u011b druh\u00fd nejv\u011bt\u0161\u00ed tepl\u00e1rensk\u00fd projekt v \u010cR. V\u00edce ne\u017e 29 000 olomouck\u00fdch dom\u00e1cnost\u00ed se d\u00edky bezm\u00e1la p\u016flmiliardov\u00e9 investici do\u010dk\u00e1 cel\u00e9 [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":25899,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0},"categories":[1269],"tags":[],"_links":{"self":[{"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/posts\/25873"}],"collection":[{"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/comments?post=25873"}],"version-history":[{"count":13,"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/posts\/25873\/revisions"}],"predecessor-version":[{"id":28566,"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/posts\/25873\/revisions\/28566"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/media\/25899"}],"wp:attachment":[{"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/media?parent=25873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/categories?post=25873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.phoenixcom.cz\/press\/wp-json\/wp\/v2\/tags?post=25873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}